![]() ![]() CONCRETE APPLICATION: May be applied to new concrete after 30 days (fully cured) and a surface temperature above 50 ☏. Apply 1 – 2 coats of finish as directed above. Floor surface must be clean, dry and free of residue before finish is applied. Top scrub the floor using Daily Scrub SC and maroon pad to remove the top soiled layers of finish. INTERIM MAINTENANCE: Sweep large debris and dust mop. Use Betco One Step High Speed Cleaner/Restorer to condition the floor and extend the time between top scrub and recoating. ![]() Buff or burnish the floor to enhance gloss as needed. Damp mop or automatic scrub using a Betco floor cleaner. ROUTINE MAINTENANCE: Sweep large debris and dust mop. A minimum of 4 coats of finish is recommended. Elevated temperatures, heavy coats and humidity may extend dry time. ![]() Allow each coat to dry thoroughly before applying additional coats, usually 30 - 45 minutes. Apply finish in uniform, thin to medium coats using a clean synthetic finish mop, microfiber mop or applicator system. RESTORATIVE MAINTENANCE: Completely remove all old wax, finish and soil from floor surface following strip procedure instructions on Betco stripper label. Recommended for use on all types of stone flooring (brick, marble, slate, terrazzo and concrete-new and old), resilient tile, quarry and non-glazed ceramic tile. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |